banner
Product
  • Phone

    00-86-15954471661

  • Address

    (Former Xinhai St.) Xiangjiang West Street, West Of Haifeng Rd., Binhai Economic Development Zone, Weifang, Shandong, China (Mainland)

  • E-mail

    k@waimaotong.com

LatestProducts
Metal Structure Building

Metal Structure Building

Metal Structure Building, US $ 890 - 1100 / Ton, AISI, GB, Hot rolled steel, Q345,Q235.Source from Shandong Hongtian Heavy Industries Co., Ltd. on Waimaotong.com.

Description

Overview
Quick Details
Standard:
AISI, GB
Grade:
Hot rolled steel
Dimensions:
Q345,Q235
Place of Origin:
Shandong, China
Brand Name:
HY
Model Number:
HYG016
Type:
Light
Application:
Metal structure
Main frame:
H beam
Purlin:
C or Z section steel
Bolt:
High strength,Ordinary,Anchor
Roof and Wall:
Sandwich panel or Corrugate steel sheet
Window:
PVC or Aluminum Alloy
Door:
Sliding or Rolled door
Welding Testing:
X-ray or Ultrasonic
Surface Modification:
Ball blasting,Painting
Certificate:
ISO9001:2000
Supply Ability
Supply Ability:
1000 Tonne/Tonnes per Month
Packaging & Delivery
Packaging Details
according to customers' request
Port
Qingdao
Lead Time :
15-30 days

 

1.Metal Structure Building Main Components

 

Main FrameH beam
PurlinC or Z section steel
Bracecross support, angle brace, brace between purlin/column/beam
Boltanchor,ordinary,high strenght bolt
Roof &Wallsandwich panel or steel plate
Sandwich panel materialsEPS, polyurethane, rock wool, glass wool
WindowPVC or aluminum alloy door
Doorsliding or rolling door

 

2.Company Introduction

 

Company Name           Shandong Hongyue Group(three subsidiary companies)
AddressNo.365,Xinhai Street,Weifang city,Shandong,China
Employee690
R&D Staff40
Main ProductSteel Structure,Space Frame,Prefabricated House,Steel Tower
Production Lines9 production lines of light steel,heavy steel,space frame and tube truss. 5 production lines of color steel plate,curtain wall and other envelope structures.
EquipmentCNC pipe cutting machine, CNC hydrauic shearing machine, Hydraulic sheet metal blending machine, Gantry submerged arc welding machine, Corrugated sheet molding machine, Shot blasting machine, Punching machine,Drilling Machine, Forging machine, H-section assembly machine,Straightener etc.
Lead Time15-30 days 
Payment TermsT/T or L/C
Website

 

3.Manufacturing Process

 

Metal Structure BuildingMetal Structure Building